Hello and welcome to the details of A week on, rescue search grows more desperate for 100-plus Nepal hydropower workers trapped in tunnel and now with the details

Nevin Al Sukari - Sana'a - Healthcare workers take a break from handling dead bodies of flood victims at Trishuli camp in Nuwakot district, Nepal on September 1, 2026. — AFP pic
KATHMANDU, Sept 2 — Nepali rescuers searched Wednesday for survivors feared trapped inside hydropower tunnels a week after devastating floods, but hopes were fading as teams hit dead ends and no one was confirmed alive.
The government had said initially it believed that more than 100 workers could be alive inside multiple tunnels.
“The search and rescue operation is still underway, and foreign teams are also supporting it at the hydropower tunnels,” said Shanti Mahat, spokeswoman of the National Disaster Risk Reduction and Management Authority (NDRRMA).
“They are continuing to work despite difficulties. There is a heavy volume of mud and debris and sludge.”
Those feared trapped are among 639 hydropower workers missing since a wall of mud and debris swept down on August 26, according to NDRRMA figures.
“In some cases it has been difficult to find the entry points and, even when they have been found, the rescuers have found the tunnels blocked inside,” Mahat told AFP. “But efforts continue.”

Security personnel stand next to unidentified bodies of flood victims kept for mass burial at the Gokarna forest reserve in Kathmandu on September 1, 2026. — AFP pic
Rescuers pulled at least three bodies out of two tunnels on Monday, and entered several hundred metres (feet) into some tunnels, but were stopped by mud.
“We have access to all the tunnels, but it’s problematic to get inside, as there are rocks and sludge,” Energy Minister Biraj Bhakta Shrestha told reporters on Tuesday.
The Nepal Electricity Authority said 11 hydropower stations and one solar power station, with a combined capacity of 431.1 megawatts, had stopped operating, about 10 per cent of the country’s installed electricity generation capacity.
Another 15 power projects under construction, with a planned capacity of 470 megawatts, were damaged. — AFP
These were the details of the news A week on, rescue search grows more desperate for 100-plus Nepal hydropower workers trapped in tunnel for this day. We hope that we have succeeded by giving you the full details and information. To follow all our news, you can subscribe to the alerts system or to one of our different systems to provide you with all that is new.
It is also worth noting that the original news has been published and is available at Malay Mail and the editorial team at AlKhaleej Today has confirmed it and it has been modified, and it may have been completely transferred or quoted from it and you can read and follow this news from its main source.



