Rocket issue forces Nasa to scrap March launch window for Moon mission

Rocket issue forces Nasa to scrap March launch window for Moon mission
Rocket issue forces Nasa to scrap March launch window for Moon mission

Hello and welcome to the details of Rocket issue forces Nasa to scrap March launch window for Moon mission and now with the details

Nevin Al Sukari - Sana'a - The Space Launch System (SLS) rocket and the Orion spacecraft, integrated for the Artemis II mission, are seen at Launch Pad 39B at the Kennedy Space Center in Cape Canaveral, Florida, on February 1, 2026. — AFP pic

Advertisements

WASHINGTON, Feb 22 — Nasa chief Jared Isaacman yesterday ruled out a March launch for Artemis 2, the first crewed flyby mission to the Moon in more than 50 years, citing technical issues.

Workers detected a problem with helium flow to the massive SLS rocket that will “take the March launch window out of consideration,” Isaacman said in a post on X.

“I understand people are disappointed by this development. That disappointment is felt most by the team at Nasa, who have been working tirelessly to prepare for this great endeavor,” Isaacman said.

“During the 1960s, when Nasa achieved what most thought was impossible, and what has never been repeated since, there were many setbacks.”

The towering SLS rocket and Orion spacecraft will be rolled back into the Vehicle Assembly Building at the Kennedy Space Center in Florida to investigate the technical issues and make any necessary repairs, Isaacman said.

A complete briefing will follow in the coming days, he added.

The highly anticipated Artemis 2 mission, lasting about 10 days, will see three Americans and one Canadian fly around Earth’s satellite.

It would be a huge step towards Americans once again setting foot on the lunar surface, a goal announced by President Donald in his first term.

On Friday, Nasa had set March 6 as the earliest possible launch date.

The US space agency hopes to put humans back on the Moon as China forges ahead with a rival effort that is targeting 2030 at the latest for its first crewed mission.

China’s uncrewed Chang’e 7 mission is expected to be launched in 2026 for an exploration of the Moon’s south pole, and testing of its crewed spacecraft Mengzhou is also set to go ahead this year.

Nasa surprised many late last year when it said Artemis 2 could happen as soon as February — an acceleration explained by the Trump administration’s wish to beat China to the punch.

But the programme has been plagued by delays.

The uncrewed Artemis 1 mission took place in November 2022 after multiple postponements and two failed launch attempts.

Then technical problems in early February — which included a liquid hydrogen leak — cut short a so-called wet dress rehearsal for the Artemis 2 launch. That was finally completed earlier this week.

The wet dress rehearsal was conducted under real conditions — with full rocket tanks and technical checks — at Cape Canaveral in Florida, with engineers practising the manoeuvres needed to carry out an actual launch.

Nasa is hoping that the Moon could be used to help prepare future missions to Mars. — AFP

 

These were the details of the news Rocket issue forces Nasa to scrap March launch window for Moon mission for this day. We hope that we have succeeded by giving you the full details and information. To follow all our news, you can subscribe to the alerts system or to one of our different systems to provide you with all that is new.

It is also worth noting that the original news has been published and is available at Malay Mail and the editorial team at AlKhaleej Today has confirmed it and it has been modified, and it may have been completely transferred or quoted from it and you can read and follow this news from its main source.

PREV Global partners cautiously welcome Supreme Court ruling on Trump tariffs, Canada calls levies unjustified
NEXT Arab, Muslim countries condemn US envoy remarks on Israel’s ‘biblical right’ to region

Author Information

I have been an independent financial adviser for over 11 years in the city and in recent years turned my experience in finance and passion for journalism into a full time role. I perform analysis of Companies and publicize valuable information for shareholder community. Address: 2077 Sharon Lane Mishawaka, IN 46544, USA Phone: (+1) 574-255-1083 Email: [email protected]