Quake data doubts cloud Japan’s nuclear comeback push

Quake data doubts cloud Japan’s nuclear comeback push
Quake data doubts cloud Japan’s nuclear comeback push

Hello and welcome to the details of Quake data doubts cloud Japan’s nuclear comeback push and now with the details

Nevin Al Sukari - Sana'a - Chubu Electric Power president admitted on January 5, 2026 that the estimated maximum seismic ground motion that the plant could experience during a quake ‘may have been underestimated’ ahead of plans to restart its two nuclear reactors in Shizuoka Prefecture, Japan. — Reuters file pic

Advertisements

TOKYO Jan 6 — A Japanese nuclear plant operator said it may have presented data underestimating earthquake risks to regulators, as Japan moves to revive nuclear power nearly 15 years after the Fukushima disaster.

Chubu Electric Power’s Hamaoka plant – located in an area of central Japan at risk of a potential “megaquake” – is undergoing regulatory safety checks, with the aim of restarting two reactors.

But the company’s president said late Monday that the estimated maximum seismic ground motion that the plant could experience during a quake “may have been underestimated”.

“This incident could seriously affect the (safety) review process and undermine the trust of local communities and other stakeholders in our nuclear business, and potentially shake its very foundation,” he told reporters during an emergency press conference.

Japan pulled the plug on nuclear power after a colossal earthquake and tsunami sent three reactors at the Fukushima atomic plant into meltdown in 2011.

However, the resource-poor nation now wants to revive atomic energy to reduce its heavy dependence on fossil fuels, achieve carbon neutrality by 2050 and meet growing energy needs from artificial intelligence.

The world’s biggest nuclear plant, Kashiwazaki-Kariwa, is expected to restart operations later this month, pending final approval from the Nuclear Regulation Authority (NRA).

The estimate of maximum seismic ground motion is important for the earthquake-resistant design of nuclear plants.

In September 2023 the NRA approved Chubu Electric’s estimate of 1,200 gal, a unit of acceleration used to measure the intensity of quakes.

But in February last year the NRA received information from a whistleblower that the utility “may have used data different from what was presented” to the nuclear watchdog, NRA official Keiichi Watanabe told AFP on Tuesday.

Since then, the watchdog has been conducting its own probe, he said.

The NRA suspended its safety review process for the Hamaoka plant in late December, and the issue “will be discussed in meetings open to the public”, the first of which will be held on Wednesday, he said.

The Hamaoka plant is located in Omaezaki, Shizuoka prefecture, near a seismic fault line where a massive Pacific earthquake is expected to occur in the coming years or decades.

In 2024, the Japan Meteorological Agency issued its first special advisory for a possible “megaquake” in the area, known as the Nankai Trough, before lifting it a week later.

The government has said a quake in the 800-kilometre undersea trench and subsequent tsunami could kill as many as 298,000 people and cause up to US$2 trillion (RM8.14 trillion) in damages.

Chubu Electric said it had set up a panel of lawyers to look into the matter. — AFP

 

These were the details of the news Quake data doubts cloud Japan’s nuclear comeback push for this day. We hope that we have succeeded by giving you the full details and information. To follow all our news, you can subscribe to the alerts system or to one of our different systems to provide you with all that is new.

It is also worth noting that the original news has been published and is available at Malay Mail and the editorial team at AlKhaleej Today has confirmed it and it has been modified, and it may have been completely transferred or quoted from it and you can read and follow this news from its main source.

PREV Nato ally Denmark warns US against taking Greenland by force
NEXT Global heatwave: 120 monthly temperature records broken across 70 countries in 2025

Author Information

I am Jeff King and I’m passionate about business and finance news with over 4 years in the industry starting as a writer working my way up into senior positions. I am the driving force behind Al-KhaleejToday.NET with a vision to broaden the company’s readership throughout 2016. I am an editor and reporter of “Financial” category. Address: 383 576 Gladwell Street Longview, TX 75604, USA Phone: (+1) 903-247-0907 Email: [email protected]