Fukushima nuclear plant begins high-stakes operation to extract radioactive debris after delay

Fukushima nuclear plant begins high-stakes operation to extract radioactive debris after delay
Fukushima nuclear plant begins high-stakes operation to extract radioactive debris after delay

Hello and welcome to the details of Fukushima nuclear plant begins high-stakes operation to extract radioactive debris after delay and now with the details

Nevin Al Sukari - Sana'a - South Korean environmental activists wearing masks of Japan's Prime Minister Fumio Kishida (right) and South Korea's President Yoon Suk Yeol (left) take part in a protest against Kishida's planned visit and Japan's discharge of Fukushima contaminated water, at Gwanghwamun Square in Seoul on September 5, 2024. — AFP pic

TOKYO, Sept 10 — A difficult operation to remove a small amount of radioactive debris from Japan’s stricken Fukushima nuclear plant began today, after technical issues suspended an earlier attempt.

Tokyo Electric Power Company (TEPCO) said in a statement that its “pilot extraction operation” had started. It will take about two weeks, according to the company.

The tiny sample will be studied for clues about conditions inside the reactors — a crucial step towards decommissioning the Fukushima Daiichi plant.

Around 880 tons of extremely hazardous material remain 13 years after a tsunami caused by a 9.0-magnitude earthquake triggered one of the world’s worst nuclear accidents.

Removing the debris from the reactors is regarded as the most daunting challenge in the decades-long decommissioning project.

“The government would like to urge TEPCO to respond with an even higher sense of urgency as we enter the most difficult work phase, which will be the basis for decommissioning the plant,” chief cabinet secretary Yoshimasa Hayashi told reporters on Tuesday.

TEPCO originally planned to start its first trial removal on August 22, aiming to collect just three grams for analysis — if the extraction process is successful.

But the company had to stop the work at a preliminary stage after detecting a problem involving the installation of the necessary equipment.

Three of the Fukushima plant’s six reactors were operating when the tsunami hit on March 11, 2011, sending them into meltdown.

The debris within has radiation levels so high that TEPCO had to develop specialised robots able to function inside.

TEPCO deployed two mini-drones and a “snake-shaped robot” into one of the three nuclear reactors in February, as part of the preparations for the removal task.

Separately, last year Japan began releasing treated wastewater from the Fukushima plant into the Pacific Ocean, sparking a diplomatic row with China and Russia.

Both countries have banned Japanese seafood imports, although Tokyo insists the discharge is safe, a view backed by the UN atomic agency.

And in a TEPCO initiative to promote food from the Fukushima area, swanky London department store Harrods on Saturday began selling peaches that were grown in the region.

Fukushima peaches are renowned for their juicy, sweet taste — but they aren’t cheap, with one box of three reportedly going for US$100 (RM433). — AFP

These were the details of the news Fukushima nuclear plant begins high-stakes operation to extract radioactive debris after delay for this day. We hope that we have succeeded by giving you the full details and information. To follow all our news, you can subscribe to the alerts system or to one of our different systems to provide you with all that is new.

It is also worth noting that the original news has been published and is available at Malay Mail and the editorial team at AlKhaleej Today has confirmed it and it has been modified, and it may have been completely transferred or quoted from it and you can read and follow this news from its main source.

PREV South Korea says North Korea has again launched suspected trash-carrying balloons across the border
NEXT Elon Musk vs. Brazilian supreme court: What’s behind the X shutdown order?

Author Information

I am Jeff King and I’m passionate about business and finance news with over 4 years in the industry starting as a writer working my way up into senior positions. I am the driving force behind Al-KhaleejToday.NET with a vision to broaden the company’s readership throughout 2016. I am an editor and reporter of “Financial” category. Address: 383 576 Gladwell Street Longview, TX 75604, USA Phone: (+1) 903-247-0907 Email: [email protected]