PIF-backed ACWA Power secures financing for $3.4bn solar plants 

PIF-backed ACWA Power secures financing for $3.4bn solar plants 
PIF-backed ACWA Power secures financing for $3.4bn solar plants 

Thank you for reading the news about PIF-backed ACWA Power secures financing for $3.4bn solar plants  and now with the details

Jeddah - Yasmine El Tohamy - RIYADH: Utility firm ACWA Power, backed by Public Investment Fund, is a step closer to building solar energy plants worth $3.4 billion across Saudi Arabia after securing finance from a bank consortium.

The company, which owns a 50.1 percent stake in each of the three projects, secured a SR8.6 billion ($2.3 billon) credit facility from local, regional and international institutions, including Saudi Awwal Bank, Banque Saudi Fransi, and Mizuho Bank according to a statement to the Kingdom’s stock exchange.

Riyad Bank, Saudi National Bank, Standard Chartered Bank and HSBC are also part of the consortium. 

The projects of Ar Raas 2, Saad 2 and Al-Kahfah have a production capacity of 4.55 gigawatts, powering approximately 750,000 households. They also have a capacity of approximately 2,000 megawatts, 1,125 MW and 1,425 MW of renewable power respectively,

Of the total investment cost, SR8.6 billion was allocated to finance projects on a non-recourse basis.

The credit facility tenor will extend for 27.75 years, guaranteed by ACWA Power pro-rata share of an equity bridge loan, standby equity and reserve account.

The Public Investment Fund-owned Water and Electricity Holding Co. also known as Badeel, is a partner in the projects with a 49.9 percent equity stake in each of the three companies. SNB is one of the financing entities. Both are related parties, the statement added.

In May 2023, ACWA Power and Badeel signed power purchase agreements with the Saudi Power Procurement Co. to develop and operate the three large-scale plants.

The solar initiatives are part of the National Renewable Energy Program, a scheme overseen by the Ministry of Energy, with PIF assigned to establish 70 percent of NREP’s target capacity.

Aligned with the Kingdom’s Vision 2030 initiative, the Ministry of Energy aims to increase the share of renewables by 50 percent of the energy mix by 2030.

The wealth fund is currently developing a total of five projects, with a cumulative capacity of 8 GW and over $6 billion of investment from the fund and its partners.

The fund’s renewable projects, including Ar Raas 2, Saad 2, Al-Kahfah, Sudair, Shuaibah 2, aim to enable and support Saudi Arabia’s private sector through requirements for significant local content contribution and the procurement of equipment, supplies and services through local supply chains.

In 2023, an ACWA Power-led consortium secured financial closure for the Al-Shuaibah solar projects with an investment of $2.37 billion. The 2,061 MW projects of Al-Shuaibah 1 and Al-Shuaibah 2, are in Jeddah and expected to be operational by 2025.

Once completed, the solar project is expected to provide power to approximately 450,000 households.

The consortium includes ACWA Power Co., Badeel and the Saudi Arabian Oil Co., also known as Saudi .

 

These were the details of the news PIF-backed ACWA Power secures financing for $3.4bn solar plants  for this day. We hope that we have succeeded by giving you the full details and information. To follow all our news, you can subscribe to the alerts system or to one of our different systems to provide you with all that is new.

It is also worth noting that the original news has been published and is available at Arab News and the editorial team at AlKhaleej Today has confirmed it and it has been modified, and it may have been completely transferred or quoted from it and you can read and follow this news from its main source.

NEXT Saudi Arabia, China discuss collaboration in urban development during Beijing meeting

Author Information

I am Jeff King and I’m passionate about business and finance news with over 4 years in the industry starting as a writer working my way up into senior positions. I am the driving force behind Al-KhaleejToday.NET with a vision to broaden the company’s readership throughout 2016. I am an editor and reporter of “Financial” category. Address: 383 576 Gladwell Street Longview, TX 75604, USA Phone: (+1) 903-247-0907 Email: [email protected]